VGQ HDDrill

Every rod,calculated.

4812162024mGasWaterEntryExit

VGQ HDDrill plans a horizontal directional drilling crossing: profile, rod-by-rod guidance, drilling fluid, tooling and time.

Sample crossing · North River
HDPE 315 mm · 700 m · clay · 9.5 m rods

Illustrative example: dimensions, geometry and estimated loads remain available to explore the demo. Results are not validated for construction.

9.5 m rods
0 / 74
Design radius
1,210 m
Depth
14.0 m
Estimated pullback
94.5 kN
0+000 — 0+400Calculator

Quick field calculator

Change one input and everything recalculates: the material's minimum radius, the bore path, the rods, the fluid and the tooling.

Crossing inputs

Illustrative example: dimensions, geometry and estimated loads remain available to explore the demo. Results are not validated for construction.

Project

Long river crossing · HDPE 315 mm · 700 m

Synthetic editable example

Example scope and adjustments
  • Tricone with a bent-housing mud motor for steering curves. Wireline and a surface grid; a walkover operator cannot cross the water.
  • Sequence includes tool changes, non-cutting return trips between passes and swivel/pull-head connection. Product pipe does not rotate with the reamer.
  • Pull and pressure are preliminary estimates; project limits and catalog data are needed to assess construction.
Pipe material
315 mm
700 m
14.0 m
Rod length
0.45 °

On site each rod allows only a small angle change. With 9.50 m rods and 0.45° per rod, the radius cannot go below 1,210 m.

190.0 m
185.0 m
Dominant soil

Builds the sample strata: the chosen soil fills the crossing depth. Changes rods, time, fluid and tooling.

What it crosses
Terrain elevations

Elevations in metres from one common datum. Design depth is measured from the lowest entered elevation. Surface interpolated between points.

River shape
260 m
50 %

Bed depths below the water surface between the banks. Banks remain at 0 m. River extent is clamped to the crossing.

Annular pressure monitoring

0 = no data. Use measured annular pressure, not pump or thrust pressure. Warning at 80% of the limit; critical at the limit. The limit must come from the project geotechnical analysis.

Project engineering data

Initial values are demonstration assumptions. Replace them with catalog and geotechnical data. A limit of 0 means unknown, not unlimited capacity.

Soil and drilling-fluid references are awaiting validation. ‘—’ means an unpublished value, not zero or that an additive is unused.

Product pipe

Allowable stress must include time, temperature, damage and safety derating. The joint factor is applied additionally. E is effective for installation duration and temperature. Collapse: enter a limit already derated for tension, ovality and temperature.

Soil and groundwater

Groundwater uses the terrain datum. It only modifies the effective-overburden reference and hydrostatic demand; it does not determine fracture pressure or replace a geotechnical study.

Surface support friction

—

Effective viscous pipe drag

—

Pipe/rod–bore friction (0 = soil default)

—

Soil unit weight (0 = soil default)

—

Fluid and reaming

PV and yield point come from rheology measurements; Marsh only provides an initial reference. Recovery reduces net water supply; doses are shown for full circulated volume, without assuming additive recovery.

Mud density (0 = soil default)

—

Measured plastic viscosity

—

Yield point (initially a Marsh reference)

—

Annular velocity (0 = soil default)

—

Circulated bore volumes per pass

—

Recovered fraction for recirculation (0–0.95)

—

Rig and drill rods

Entered ratings must match actual equipment condition and operating regime. Torque is checked against the smaller rig/rod limit. Calculated rod capacities do not verify threaded joints.

String friction during pullback

—

Viscous string drag

—

Simulation tooling
Guidance system

The demo chooses: river or rail, wireline with grid; long crossing, wireline; walkable ground, walkover receiver.

Pilot bit

Select milled teeth or carbide inserts according to the tool specification.

Tricone cutters
Downhole motor

Mud flow turns the bit without rotating the string; with a bent housing it can steer in rock. Needs minimum flow and pressure.

Reamer

Closed body that widens and packs the wall in clay and sand.

Demo passes, increments ≤150 mm (not a field prescription): 258 → 365 → 473

Plan
Existing utilities

Centre depth below local ground. Demonstration transverse crossings.

Gas
Water
Rig class

Comparison by estimated pull only; it does not select a rig by torque, thrust or flow. Enter actual ratings in Project engineering data. Changing class clears the previous rig-specific ratings.

BackgroundFollow the pageCharcoalNightGrayPaperSkyWhite
4812162024mSAND · 0–1.5 mCLAY · 1.5–20 mSAND · 20–25 mRiverbed · 5.0 mGas · 1.4 m↕ 12.6 mWater · 2.6 m↕ 11.4 mH 14.0 m · 325 m · R 1,210 m6.7°7.7°

Thickness and equipment enlarged for visibility; nominal diameter shown · HDPE · Ø 315 mm

Result

9.50 m rods
74
Estimated pullback
94.5 kN
53 % of rig capacity
Design radius
1,210 m
Material minimum radius
9 m
Per-rod minimum radius
1,210 m
Design minimum radius
1,210 m
Change per rod on curves
0.45 °
Entry angle
6.70 °
Exit angle
7.68 °
Drilled length
701.4 m
Straight run
325.0 m
Ream Ø
473 mm
Bending stress
0.10 MPa
Estimated time
—

Review

  • Differential pressure 1.4 bar against 0.8 bar allowable collapse per the published method (the project entered no limit). With an empty pipe, fill it with water during pullback or use a lower SDR; if you have the manufacturer's datasheet, enter its limit.

Bentonite & polymers

A plan for every soil type

How each soil is drilled

Bentonite, polymer and flow for each stratum of the crossing, with the formula in plain sight.

  • Clay

    It's the calculator's soil

    Cohesive soil. Plasticity, swelling and balling depend on mineralogy and water. Assess inhibition and cleaning through testing; clay does not have one universal recipe.

    Bentonite
    —
    PHPA polymer
    —
    Marsh viscosity
    —
    Density
    —
    Advance
    —
    Additional inhibitor
    —
    PAC
    —
    Lubricant
    —
    Bit
    Tricono (milled tooth)
    Reamer
    Clay Cutter / Blade Reamer

    Soil and drilling-fluid references are awaiting validation. ‘—’ means an unpublished value, not zero or that an additive is unused.

    Calculation reference · version 0 · Referencia heredada del prototipo; pendiente de validación con ensayos y fichas del proveedor.

Drilling fluid recipe

Dose per cubic meter of fluid for the selected soil, and the total for this crossing.

Soil and drilling-fluid references are awaiting validation. ‘—’ means an unpublished value, not zero or that an additive is unused.

PV and yield point come from rheology measurements; Marsh only provides an initial reference. Recovery reduces net water supply; doses are shown for full circulated volume, without assuming additive recovery. · Circulated bore volumes per pass: — · Recovered fraction for recirculation (0–0.95): —

Clay: 100 %

ProductDose · Total
Sodium bentoniteViscosity and filter cake——
PHPA polymerInhibits clay hydration——
PACFluid-loss control——
LubricantLowers torque and friction——
Clay inhibitorStabilizes reactive formations——
Marsh viscosity
—
Density
—
Pump rate
—
Total fluid
—
Estimated net water supply
—

Tooling

Tools recommended for the selected soil carry an orange bar. Tap any tool to open its sheet.

Pilot bit
Tricono (milled tooth)
Reamer
Clay Cutter / Blade Reamer
Reaming passes
3
Available rig thrust
178 kN
Penetration
—

Soil and drilling-fluid references are awaiting validation. ‘—’ means an unpublished value, not zero or that an additive is unused.

0+400 — 0+800Rods

Rod by rod

This is how it is tracked on site. Every rod has its station, depth and pitch. Add rods to simulate the pilot hole advancing.

4812162024mB2014.0B4010.0B6012.8GasWaterEntryExit

74 of 74 rods drilled

Speed
Frac-out riskMediumHigh

Actual survey

Paste the locator readings, one rod per line: rod; depth (and station if you have it). They are compared against the design.

Depth below local ground/riverbed, not absolute elevation. CSV decimal points or semicolons with decimal commas. Duplicate/out-of-range rods and negative depths are rejected.

Last 8 rods · Tap a row to find it in 3D.
RodDepthPitch
0+700.00.00 m+13.5 %Sand
0+692.21.05 m+13.5 %Sand
0+682.82.32 m+13.4 %Clay
0+673.43.59 m+12.8 %Clay
0+664.04.79 m+12.0 %Clay
0+654.55.92 m+11.2 %Clay
0+645.16.98 m+10.4 %Clay
0+635.67.97 m+9.6 %Clay

Minimum curvature survey

Paste station readings (measured distance, pitch and heading) to compute the actual hole position, compared with the design at the same distance.

Measured distance in m; pitch in % with the rod table sign (negative going down); heading in degrees from North. The first reading sets the starting direction. Minimum curvature: circular arcs between stations.

Once you load readings, the computed positions and the offset from the design appear here.

Pilot loads and pressure

Thrust, torque and annular pressure estimated rod by rod, with a simple friction model. Use it to see which variable governs; the coefficients are assumptions to be calibrated with field records.

Illustrative example: dimensions, geometry and estimated loads remain available to explore the demo. Results are not validated for construction.

0.04793140187Measured distance (m)701 mLimit · 178.0 kN

Thrust

Peak · Thrust
28.4 kN
Limit
178.0 kN · 16 %
Pullback tension
94.5 / 1,121 kN
Rod
Ø 89 · 16.0 kg/m
Formulas and assumptions
  • Buoyed rod weight: w' = m·g·(1 − ρ mud / ρ steel)
  • Per segment, from the bit toward the rig: N = √[(w'·L·cos α)² + (F·Δα)²]
  • Thrust: F += μ·N − w'·L·sin α, starting at the bit cutting force
  • Torque: T += μ·N·rod radius (with a motor: bit reaction, no rotational string drag)
  • Annular pressure: ρ·g·depth + friction loss in the slot (mud plastic viscosity and yield point)
  • Yield: torque = (π/16)·(OD⁴ − ID⁴)/OD · 0.58·σy · tension = A·σy

μ = — · F corte = — · ρ lodo = — · τy = — · w' = 136 N/m

Excludes reaming torque, string buckling, joints and transients. Product pipe pull uses a separate staged model; it does not implement ASTM F1962. Uncertainty can increase or decrease the results.

Pipe and supply assessment

Peak product pipe pull
92.9 kN
Estimated total rig pull
94.5 kN
Returns without cutting
—
Tool changes
—
Wall / inner diameter
18.53 / 277.9 mm
Empty pipe mass
16.40 kg/m
Submerged effective weight
-0.646 kN/m
Axial + bending stress
5.38 + 0.10 = 5.49 MPa
Axial pull capacity after bending
156.5 kN
Hydrostatic differential pressure
1.45 bar
Circulated volume
—
Estimated net water supply
—

Axial + bending stress: Within entered limit · 60 %

Hydrostatic differential pressure: Exceeds entered limit · 174 %

Negative: floats; friction acts against the bore crown.

No catalog or study reference

Project engineering data ↑
Formulas and assumptions
  • Section: A = π·(OD² − ID²)/4; mass = ρ pipe·A
  • Effective weight: w' = g·(mass + ρ water·inner area·fraction − ρ mud·outer area)
  • Segment pull: F = max(0, F + μ·|w'|·L·cos α + w'·L·sin α)·exp(μ·Δθ)
  • Stress: σ axial = maximum F/A; σ bending = E·OD·κ/2; κ combines plan and profile

Quasi-static staged estimate: section weight, ballast, buoyancy, friction, gravity and bend amplification. Surface supports: initial μ = 0.10, editable. Rig pull adds the string ahead, separately from product pipe tension. Entered viscous wall drag is added as π·D·L·τ; it is not rheological yield point. Excludes reamer cutting, hydrolock, stuck pipe and transients. Axial + E·D/(2R) is a preliminary elastic check; it does not implement ASTM F1962 or calculate collapse capacity. Internal water only offsets differential pressure when the pipe is completely filled and open at the exit.

PPI · PE Handbook · HDD

Compare designs

Save up to two designs as baselines (A and B) and compare the current one against them, metric by metric and on the profile.

Illustrative example: dimensions, geometry and estimated loads remain available to explore the demo. Results are not validated for construction.

  1. 1. Save the design in A (and another in B if you want).
  2. 2. Change data in the calculator.
  3. 3. Come back with the floating button.
Baseline AEmpty
Baseline BEmpty

No baselines yet. Save the current design or try the example.

What if…

Choose an incident and the rod where it happens: the hours and mud it would cost are estimated, with the usual response steps.

Soil and drilling-fluid references are awaiting validation. ‘—’ means an unpublished value, not zero or that an additive is unused.

Incident

Mud escapes into permeable or fractured ground and stops returning at the entry.

R37 · at 352 m measured · cover 9.0 m · clay

4812162024m
Extra hours
—
Over plan
—
Extra mud
—
Total hours
—

Usual response

  1. Reduce pump flow and pressure.
  2. Raise viscosity and add lost-circulation material.
  3. Replace volume and resume gradually, watching returns.
  4. Log the station and lost volume in the daily report.

All four incidents at R37

——
——
——
——

Illustration with simple starting rules: it does not estimate probability or replace the project's contingency plan. Values are calibrated with daily site reports.

Daily report

One row per shift: meters, rods, hours, crew and incidents. It compares actual progress against the calculated plan.

Shift
Stage

Saved only in this browser: there are no accounts or database yet. Download the CSV so you do not lose it.

Pilot

0 / 701 m · 0 %

Reaming

0 / 2,104 m · 0 %

Pullback

0 / 701 m · 0 %

Hours: 0 worked of — estimated · 0 standby

No shifts logged yet. Try the example report.

PDF report

A concise report with the data, results, loads, mud, checks, rod table and assumptions, ready to save as PDF or print.

Tooling

01/ 04

TCI tricone

Drills the pilot hole in hard and mixed ground: three cones with carbide inserts that crush as they turn.

Generic representations. Tool shape and cutter layout vary by tool type.

Industry brands

Backing, not results

Brands add. The math stays put.

VGQ HDDrill grows with the support of rig, fluid and tooling manufacturers. That support buys visibility, never results.

Manufacturer A · Model 40×55

Verified sheet
Thrust and pullback
178 kN
Torque
7 450 N·m
Covers this crossing
Yes · 41 %
Operator manual
Link to the manufacturer site

Source: manufacturer spec sheet, rev. 2025-03. Fictional name and figures.

  1. Verified catalog

    Every equipment sheet carries the source and date of each figure, verified by the manufacturer.

  2. Labeled sponsorship

    Paid content says “Sponsored”. Doses and radii come from the calculation, not from the sponsor.

  3. Licensed manuals

    Manufacturer manuals come in under license. Without one, we link to the official document.

  4. Let's talk about your brand

Equipment catalog

This is how the catalog is organised. Open a category for sheets, what to specify and quotes.

See the whole catalog →
1+200 — 1+600Manuals

Field manuals, done the right way

Technical data and calculation methods can be used. What is protected is how someone else wrote them: the text, tables, drawings and logos. Every piece of content comes in through one of these paths.

Own
VGQ HDDrill field manuals, soil guides, checklists and sheets.
Written from experience, using public data in our own words with the source cited.
Licensed
Full manuals, diagrams and photos from a manufacturer.
Only with written permission, negotiated inside the brand agreement.
Referenced
Rig specifications and chemical safety data sheets.
Figures are loaded with source and date, and the official document is linked.
Standards
ASTM F1962, ASCE MOP 108 and industry guidelines.
The standard is purchased, the method implemented and cited. Its text is not copied.

Product guidance, not legal advice. An intellectual property lawyer reviews it before any brand agreement.

Try it on your next crossing.

We are opening the demo to operators, engineers, brands and investors.

VGQ HDDrill

Open the application

Private beta: sign in with your invited account. If you do not have access yet, ask your company administrator for an invitation. This page does not create accounts or send invitations automatically.

Sign in

You can explore the demo without an account from the sign-in screen; test data stays on your device.